2024年4月30日星期二

Shipping PME Chiksan Flowline Fittings 2in FIG1502 Sour Gas Service and Suction Discharge Hose by 40 HQ FCL

 

Labor Day Holiday start from May 1, and resume on May 6. PME sales team is available to answer clients' RFQ about High Pressure Drilling Hoses and Chiksan Flowline Iron Fittings, technical parameters and purchase orders during the holiday.

 

Please Email: contact@pmeindustrial.com or WhatsApp: +86-13808990736 for instant support.

 

For the last PME shipment in April, we handover the packages of hoses and flowline fittings and load the packages into 40 HQ container. The below photos of low pressure hoses and flow back irons are partial of this batch shipment. Happy Labor Day and Wish we all have a fruitful month in May.  

 

Cushion Elbow, 3" FIG1502 MxF

Target Tee, 3" FIG1502 MxFxF, FxMxF

Plug Valve, 2" FIG1502 MxF

Test Plug Male Cap 4" FIG206, C/W 1/2" NPT

Adjustable Choke Valve, 2" FIG1502 MxF

Oil Suction and Discharge Hose

4", WP 300 Psi, 3 Meters












没有评论:

发表评论